Thứ Tư, 13 tháng 9, 2006

The Gift That Keeps on Giving

Have you ever had one of those rashes that just won't go away? Hemorhroids maybe or even a recurring cold sore? That is how the plumbing is in this place. Way back in the days when I was really stupid, we paid a plumber to install the waste system and vents. The work failed to hold air and I fixed it. Then it failed inspection and I had to replace a third of the pipe so it would pass. Then there was the 10 inch center toilet we had to special order when we have 3 perfectly good 12 inch toilets laying around because "Placebo the Useless" couldn't measure 12 inches from the wall. Now I have this to deal with



The Stanley knive is there for scale but indicates that the top of the flange is a full inch off the floor. This is after laying in the half inch backer board! If we lay ceramic tile with a thick mortar base I can only go up a half inch at most so I am going to have to make a separate riser to place under the toilet to raise it off the floor and stop it from wobbling. Then I have to conceal the gap. This is why I no longer pay people to screw something up when I can screw it up perfectly well myself for free.

Can you say "incompetent moron" boys and girls? If this plumber didn't have hemorrhoids he would be a perfect asshole!

Không có nhận xét nào:

Đăng nhận xét