So if you read the previous post about the history of Shawen Acres and the Montgomery County Children's Home you would realize that the facility stopped being a home for orphans in the 1970s after it was determined that children were better off in foster care with individual families. The large administration building remained in use until 2001 when the modern Haines Children's Center building was opened. The original buildings have sat vacant and unused for 11 years. During that time the roofs of many buildings developed leaks or were accessed by racoons, birds and squirrels. Some of the basements flooded and the humidity inside the structure has caused paint to peel and floor boards and joists to buckle and warp. Vagrants have accessed the buildings for shelter and thieves have removed air conditioning units and copper plumbing. The porches have become popular locations for prostitutes to perform the horizontal hoochee and the 19 acre grounds are too large for the county sheriff to police. The county has submitted a proposal for demolition and a re-use plan that includes expanding the green space on the property and preserving the original nursery building which was restored and is currently used. The neighborhoods support the plan but the Landmark Commission voted 4 - 3 to preserve the structures. The county intends to bring the case before the city commission on May 30, 2012 because we have the ability to overturn the Landmark Commission recommendation. When I heard this I asked to see the interiors of the buildings. Some would say that I know a thing or two about renovation work. You are about to view a series of pictures. They are not labeled as to which building is which but I can tell you that all the buildings except one which was preserved several years ago are in similar condition. The structures are ALL concrete block institutional type buildings with no insulation and iron joist beam support for the second story in each structure. Many of the interior rooms are very small with concrete interior walls. There are no outstanding architectural details inside any of the buildings. The arts and crafts fire places are very plain. The only attractive feature about the buildings is how they appear from the outside. The tile roof, fancy chimneys and stucco English cottage style are the only good thing about the buildings. The buildings have deteriorated because the county uses money allocated for children's service to attend the needs of children and not to maintain and heat empty buildings. These buildings are not really relocatable due to the masonry construction and if they were renovated on site they would have to be used to serve "helpless and unfortunate children" due to a deed restriction.
The front of the administration building will be salvaged and reused on the grounds.
This is the back of the administration building. The attached gym was demolished in 2004.
A vulture flew out of this hole in the roof while I was there. Maybe it was feasting on something inside!
This is just one of many large piles of raccoon poop present in one of the buildings.
This ridge under the carpet is due to a warped floor joist that has risen some six inches.
This is looking up through the ceiling to the light shining through a hole in the roof.
The renovated former nursery looks like this. Now that you have read all this and seen the pictures you would likely agree that the only future for these structures is to demolish them. However, if you have the funds and a reuse plan for the buildings that serves the purpose as listed in the deed restriction then you can call the Assistant County Administrator, Amy Weideman at 937-225-5802 to discuss your ideas. If they are feasible then the county may throw in funds that are saved from the demolition budget which is almost $350,000 for the entire project. I would do it before summer though because these will start to come down in the fall of this year assuming we overturn the decision of the Landmark Commission that is.
Hiển thị các bài đăng có nhãn Dayton. Hiển thị tất cả bài đăng
Hiển thị các bài đăng có nhãn Dayton. Hiển thị tất cả bài đăng
Thứ Hai, 30 tháng 4, 2012
Thứ Bảy, 28 tháng 4, 2012
Shawen Acres AKA Montgomery County Children's Home - Then
According to Wikipedia
Shawen Acres, also known as the Montgomery County Children's Home, is an historic complex at 3304 N. Main St. in Dayton, Ohio. It was added to the National Register of Historic Places on October 9, 1991.
It was originally designed as an orphan’s home. Dr. Charles Shawen donated 19 acres (77,000 m2) to the county March 21, 1926 for "wayward and homeless children." The complex comprises a main building, annex, gym, and 10 English-style cottages in a park-like setting.
Here is the Sanborn Fire Insurance map from 1932
javascript:; This is how the grounds looked in 1955. Not certain what the extra buildings were but one may have been a boiler room to heat all the buildings.
This was the nursery building back in the day. This is the only building that has been renovated and is still in use today. You can read about the place in it's current condition in the next post.
Here is a photo of a photograph that hangs on the wall in the renovated nursery building showing the place soon after inception.
This stone lies near the same building. There is a sad tale to tell about this facility now and you can read about it in the next post.
Thứ Ba, 1 tháng 2, 2011
Dayton Patented
Dayton, Ohio has the unique reputation as being the city with the most patents per capita than any other city in the United States. It had over 1200 patents issued before 1868. I have been researching some of them because I find some of the inventions interesting. Dayton is famous for the airplane, the automotive starter motor, the ice cube tray and the pop top can BUT did you know that Dayton has claim to the automatic gate, a wringer and of all things House paint? Anyone who owns a Victorian brick house may find this patent interesting. It is for house paint and is from 1837. We still have flakes of this or something similar on our place. Click on the image to read the ingredients.

Thứ Hai, 10 tháng 1, 2011
Year End Update With Pictures!
I get asked this question often. "Did you finish your roof?" The answer is "No, but it is two fifths done."
The gutters are the time consuming part. They have to be riveted and soldered in place and each corner has to be custom made. There are eight corners due to us having a bay section with four 135 degree corners. The good news is that six of the eight corners are in place so in the spring I just have three straight sides and a dormer to remove and replace with a window similar to the others. I am not looking forward to that window construction.
So here is why it has taken so long. Besides the roof, I had to brick up this hole in the wall.

I still have one row to complete but it involves standing on a ladder. I don't stand on ladders unless it is at least 45 degrees Fahrenheit. Here is a news clip from New Years Eve where I get asked about the roof. This was aired live at 6:10 AM so I was up early for it.
I had three downspouts to replace. This had to be done to stop the waterfall we encountered on Thanksgiving Day in our bedroom and parlor which was also the result of not completing a section of gutter before a torrential rain.
Then there was the eight tons of wood pellets that were delivered and moved to my basement. Before they could be stored, I had to remove a huge pile of wood and store it outside.
We had a furnace installed this year.

I actually paid for this to be done. If you live in the Dayton area, call Mr. Hartley who owns Dayton Air Conditioning and Heating, at 937-277-8864 and tell him the Mayor referred you. I did have a role to play in the installation.
My role was to seal up a window opening that we used to vent the furnace. I put in a second piece of 4" pipe for future use if needed. It is easier than knocking a hole in the wall!

While I was at it, I replaced the bulkhead doors which were destroyed by some kids trying to break into the house in 2009.

Then I installed this door in the basement in case you get through the bulkhead doors!

I have also made a bead board wall to replace the handrail to the third floor so that I can install a door and keep some heat in the house. I have also replaced the toilet in the Steampunk bathroom with one that actually works and doesn't require three flushes to clear! I also put a toilet in the 2nd half bathroom area (also the laundry room)so that I don't have to look at the hole in the floor any more!
Did I mention lining a chimney so that we could use the wood stove in the parlor? Well I did that too. I poured vermiculite around the liner and wondered why it was taking so much to fill the space. After entering my bedroom I saw the problem. My fireplace had filled up with vermiculite! This meant that there was a hole between my chimneys. After figuring where it was I proceeded to knock a hole in the chimney to repair the hole. After repairing the hole and pouring vermiculite again, I discovered another hole higher up. So I had to make an even bigger hole in my chimney to repair it. Here is a picture. I still have three bricks to install in order to finish the work.

After all this, homeschooling my daughter and doing Mayoral things there are still people out there that call me lazy!
The gutters are the time consuming part. They have to be riveted and soldered in place and each corner has to be custom made. There are eight corners due to us having a bay section with four 135 degree corners. The good news is that six of the eight corners are in place so in the spring I just have three straight sides and a dormer to remove and replace with a window similar to the others. I am not looking forward to that window construction.
So here is why it has taken so long. Besides the roof, I had to brick up this hole in the wall.
I still have one row to complete but it involves standing on a ladder. I don't stand on ladders unless it is at least 45 degrees Fahrenheit. Here is a news clip from New Years Eve where I get asked about the roof. This was aired live at 6:10 AM so I was up early for it.
Leitzell praises risk takers: wdtn.com
I had three downspouts to replace. This had to be done to stop the waterfall we encountered on Thanksgiving Day in our bedroom and parlor which was also the result of not completing a section of gutter before a torrential rain.
Then there was the eight tons of wood pellets that were delivered and moved to my basement. Before they could be stored, I had to remove a huge pile of wood and store it outside.
We had a furnace installed this year.
I actually paid for this to be done. If you live in the Dayton area, call Mr. Hartley who owns Dayton Air Conditioning and Heating, at 937-277-8864 and tell him the Mayor referred you. I did have a role to play in the installation.
My role was to seal up a window opening that we used to vent the furnace. I put in a second piece of 4" pipe for future use if needed. It is easier than knocking a hole in the wall!
While I was at it, I replaced the bulkhead doors which were destroyed by some kids trying to break into the house in 2009.
Then I installed this door in the basement in case you get through the bulkhead doors!
I have also made a bead board wall to replace the handrail to the third floor so that I can install a door and keep some heat in the house. I have also replaced the toilet in the Steampunk bathroom with one that actually works and doesn't require three flushes to clear! I also put a toilet in the 2nd half bathroom area (also the laundry room)so that I don't have to look at the hole in the floor any more!
Did I mention lining a chimney so that we could use the wood stove in the parlor? Well I did that too. I poured vermiculite around the liner and wondered why it was taking so much to fill the space. After entering my bedroom I saw the problem. My fireplace had filled up with vermiculite! This meant that there was a hole between my chimneys. After figuring where it was I proceeded to knock a hole in the chimney to repair the hole. After repairing the hole and pouring vermiculite again, I discovered another hole higher up. So I had to make an even bigger hole in my chimney to repair it. Here is a picture. I still have three bricks to install in order to finish the work.
After all this, homeschooling my daughter and doing Mayoral things there are still people out there that call me lazy!
Đăng ký:
Bài đăng (Atom)